Kohesio: discover EU projects in your region

project info
Start date: 1 January 2015
End date: 31 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 6 962 284,38 €
EU contribution: 4 200 000,00 € (60,33%)
programme
Programming period: 2014-2021
Managing authority: Conseil Régional d'Auvergne

Thermal renovation of the Mutualised Teaching and Biology Pole on the Campus des Cézeaux

The projects Pôle Mutualisé d’enseignement et Pôle Biologie are designed to restructure and rehabilitate 12.000 m² of premises located on the campus of Les Cézeaux and occupied by the UFR Sciences et Technologies, the animal industry, the LMGE and AME2P laboratories, with a view to the creation of the Mutualised Teaching Pole and the Biology Pole. These projects were translated into the CPER 2015/2020 as part of the green and building energy transition. ERDF assistance is targeted at improving the energy performance of the buildings concerned, leading to a significant reduction in operating costs. In addition to the annual energy savings (see indicator above), the project will avoid the emission of 491 tonnes equ.CO2/year.

Flag of France  Puy-de-Dôme, France