The operation, carried out by the EPL, consists of carrying out all the studies listed in the PAPI of intent of the Vals d’Authion et de la Loire on non-domanial protection works, whether or not classified, mandatory and/or necessary before carrying out work (security, comfort,). Action eligible for Action 4 of Axis 1 of the ERDF Loire Bassin.