Reconstruction of Item 1 — Studies and Works Following the feasibility study, the first solution was chosen by the contracting authority on the basis of the study report. This solution consists of demolishing the apron built in 1957 to the level of the raven made in the second phase in 1965.share on FacebookTwitterLinkedinEmailreport an issue