During the project, the lighting system will be installed, the area greenfields, small architectural elements, the monitoring and security system, the existing bridges near the Dane river and the bridge leading to the island will be renovated, the quays and coasts of the water body have been cleaned, pedestrian and bicycle paths are installed, and children’s playground is installed. The territory will be adapted for the organisation of events, seating places will be provided, the venue for organising events will be arranged, new engineering networks will be opened, and a lift will be installed for the entry of disabled people into the territory.