The project is aimed at implementing investments for increasing the energy efficiency of Barter EOOD through the implementation of 7 energy saving measures resulting from the energy efficiency audit carried out on the production base of the company located in the town of Sevlievo. The project aims at increasing the energy efficiency of the company’s additional activity, which includes the construction of residential and non-residential buildings, with 7 180 966.52 kWh/year in order to provide it with the total annual energy consumption (for the selected representative year 2015). In order to reduce the energy intensity of the activity, reduce the production costs and increase the economic efficiency of the activity, within the framework of this project we envisage the implementation of the following measures, resulting from the recommendations of the energy efficiency audit: Measures (activities) to be implemented under Element A of the procedure:- Measure 1: Delivery and commissioning of 2 new auto concrete mixers;- Measure 2: Delivery and commissioning of a new chassis crane;- Measure 3: Delivery and commissioning of a new concrete pump;- Measure 4: Delivery and commissioning of 8 new tractors;- Measure 5: Delivery and commissioning of 4 new diesel forklifts and 1 new four-pillar electric forklift. Activities to be performed under Element B:- Measure 7: Reduction of energy costs by introducing an automated system for monitoring and control of energy consumption.Element B activities include the introduction and certification of an energy management system according to standard BDS EN ISO 50001/EN ISO 50001.