Kohesio: discover EU projects in your region

project info
Start date: 16 July 2018
End date: 31 May 2024
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 5 645 634,65 €
EU contribution: 4 263 724,43 € (75,52%)
programme
Programming period: 2014-2020
Managing authority: Главна дирекция „Оперативна програма „Околна среда“ в Министерство на околната среда и водите
beneficiary
European Commission Topic

“Second combined procedure for design and construction of composting installations and pretreatment installations for municipal waste” under Axis 2 of OPE 2014-2020 of RSPO — region Asenovgrad

The PP envisages to be used as a comp. and — for the fourth third. of bit. The project will contribute to achieving SO 1 of PO 2 “Waste”. On the basis of morpho. analyses carried out by RSUO. Morf analysis is an acknowledgment. The methodology set out in Act No RD-744/2012 of the Ministry of the Environment and Water. Co-founded and accepted by the General Assembly of RSUO, ANALIS for effect on a central or decentralised approach for infrastr. management. in connection with the development of a comp. for the collected biodegr. of the Territ. of RD — Asenovgrad, the forecast cap of the e-i was set at 12.000 t/year. Based on experience in Europeans with similar cl. and situation. y., in the PIP is recommended for composting. in re.c. with canopy, by means of an ac-rm, where the maintenance of the system, for proper operation of the compost. is less than a cl., and the machines are low-exp. and simplified. The operating system is an opt, as the machine is an automatic machine and there is no need for non-existence of the presence of an obsc. Comp. and the — - Automation and stirring machine. Rabs has changed and can be an inverter. It’s about aeration. For Components Inc.:- Acceptance, Preliminary Treatment and Screening;- Cl. for Pre-Computer, CL. for final comp.;- I-I-tions for purification and biofilters;- M- for drying of Compt. capture of water. Coll. and accepted with P-l of RSUO’s General Assembly' ANALIS for effect. of center or decent. approach for infrastr. in time with a rise on the front trek. of mixed bits of territ. of RD-Asenovgrad, the forecast captain of the e-i is named 22 500 t/year of mixed sav. b. Two modules of the Preliminary Treatment Installation: I'M A SEPARATOR. I-Z and II — I-Z for the stab. IT’S THE BIO FRACTION. The received m-l of ex., stabilisated org. fractals, which will be handed over to the next.

Flag of Bulgaria  Bulgaria