Title of the call: Infrastructural development of learning spaces in state-run public education institutions. Title of the project: Infrastructural development of the Versend Elementary School, its learning spaces. Name of project promoter: Total costs of the Mohács School District Centre are gross: 120.109. 677 Ft Required támogatás:120.109. 677 HUF Relevant Operational Programme and Priority: EFOP-4.1.3-17. Link to development direction: the project is closely linked to the target system of both domestic and community public education strategic programmes. The development of the project supports and serves: closing the large regional development gap between some areas, reducing the share of low-skilled people, preparing for lifelong learning, and access to quality inclusive education and education for children from disadvantaged backgrounds and special needs. The specific objective of the project is to: In the state-run Versendi Elementary School with underdeveloped infrastructure, the implementation of infrastructure development that promotes fair, quality and inclusive public education and effective compensation for pupils’ disadvantages. It enhances the effectiveness of the institution, education to encourage openness and the quality of the services it provides. The direct target groups of the project are: educators and pupils of the State-maintained Elementary School of Churchesharaszt, affected by the development. The institution is located in the socially and economically disadvantaged area of Bély, which is in accordance with Article 290/2014. (XI.26) district beneficiary under Government Decree (XI.26). Eight grade elementary school. The number of children with multiple disadvantages and special educational needs is significantly above the national average in the institution. At present, it does not have the necessary environment and tools to overcome cultural — social disadvantages. It has the necessary specialists to perform the task. SECTION 20/2012 (VIII. 31) the 2014/2015 was entitled under the EMMI Decree. In the academic years 2015/2016 and 2016/2017, the use of additional support for capacity-developing preparation. Place of implementation: 7752 Versend, Kossuth Lajos utca 1. The village of Versend is a bag town. It is located in the DK part of Baranya, from the Pécs-Mohács main road to É, directly along the main road. In the second half of the 18th century German-speaking residents settled in the second half of the 18th century. THE XIX. Towards the end of the century, a significant number of Gypsies moved to the village. At present, their population is dominated by their population. Its permanent population has been growing steadily in recent years, mainly due to the increase in the birth rate of the population living here. Versend is a village with 966 people in 2017. Compared to surrounding settlements, there is no risk of ageing, and the ageing index decreases year after year. In addition to the increase in live births, immigration is also characteristic, which also leads to stability in the number of permanent populations. However, Versenden also has a high emigration rate, which can be explained by increasing insecurity, poor social situation and unemployment. Projket activities: Mandatory and self-eligible activities: External and internal refurbishment of moistening walls, closing the gangway — moving a room to the library part of the building by separating a room suitable for developmental activities from the existing classroom Optional, ineligible, ineligible activities: Repair of roof structure, replacement of rain ducts, expansion of a gym sewage pit, installation of new shafts, refurbishment of heating (replacement of convectors), replacement of pendant and gutter Electrical modernisation — replacement of wiring, fittings and luminaires Accessories Renovation of the Schoolyard — courtyard organisation, playground equipment installation, green surface plant replacement Lightning protection Teacher room renovation — floor coverings, painting-painting, door-closing repair Tools: The purchase of modern tools to support everyday physical education, pupils from disadvantaged backgrounds and students with special educational needs. Aid claimed for the purchase of equipment — within the total cost of the project 3. 296. 657 HUF) All developments and modernisations serve to equalise territorial differences. Start and end implementation: 2017.09.01.-2018.10.31. (14 months)