Title of the call: Infrastructural development of learning spaces in state-run public education institutions. Title of the project: Infrastructural development of the district Elementary School of Churchesharaszt, infrastructural areas for learning. Name of project promoter: Mohács Department Center. The total cost of development is 120.109 gross. 677 HUF. Aid claimed 120.109 gross 677 HUF. Operational programme and priority concerned: EFOP-4.1.3-17. The development is closely linked to the target system of both domestic and community public education strategic programmes. The development of the project supports and serves: closing the large regional development gap between some areas, reducing the share of low-skilled people, preparing for lifelong learning, and access to quality inclusive education and education for children from disadvantaged backgrounds and special needs. The specific objective of the project is to: Implementation of infrastructure development at the Churchhousesharaszt District Elementary School with a lack of infrastructure that helps to ensure fair, quality and inclusive public education and to effectively compensate pupils for disadvantages. It enhances the effectiveness of the institution, education to encourage openness and the quality of the services it provides. The direct target groups of the project, teachers and pupils of the State-run District Primary School of Churchesharaszt, affected by the development. The institution is located in the socially and economically disadvantaged area of Siklós, which is in the 290/2014. (XI.26) district beneficiary under Government Decree (XI.26). All the municipalities and the population of the school’s enrolment area are multiplely disadvantaged. The vast majority of families suffer from general poverty. In their way of life, life prospects and quality of life, they have become more and more distant from the social average. Emerging from this world, which is isolated from the majority society, would be ensured by the knowledge gained in a modern, modern, aesthetic, quality education institution. Eight grade elementary school. The number of children with multiple disadvantages and special educational needs is significantly above the national average in the institution. At present, it does not have the necessary environment and tools to overcome cultural — social disadvantages. The staff required to perform the task is available in the institution. SECTION 20/2012 (VIII. 31.) on the basis of the Decree of the Minister for Human Resources, the school was entitled to the 2014/2015 In the academic years 2015/2016 and 2016/2017, the use of additional support for capacity-developing preparation. Activities to be carried out under the project and which can be independently supported: development of a gymnastic room and development sessions, development of a sports yard — the establishment of a basketball court in the schoolyard, replacement of the flooring and lining of the classrooms, and partial replacement of the covering of common rooms. Replacement of facade doors and interior doors and interior doors in common rooms. Optional, ineligible actions: roof insulation of flat roofed building — thermal insulation and rainwater insulation, building electric modernisation, renovation of the power current system of the school building, replacement of distributors, wiring, fittings, luminaires and light sources. Technical building renovation — modernisation of drinking water and sewage network, replacement of heat take-off surfaces. Accessibility of the entrance. Design of a playground/rail — as a renovation of the schoolyard, installation of playground equipment, green surface plant replacement. Purchase of equipment: Purchase of equipment and equipment for everyday physical education and language teaching. The improvements create the basic conditions that contribute to reducing school leaving without education because they provide conditions that are essential for quality education. Creating the right learning environment, which is motivating, reduces drop-out. Aid requested for the purchase of equipment — within the total cost of the project 6 096 000 HUF.All developments and modernisations serve to balance territorial differences. Start and end implementation: 2017.09.01.-2018.10.31. (14 months).