Professional duration of the project: — CAADEX Kft.'s new 2.107 m² production hall, social building and office to be built at its new branch in Komló, as well as outside works within the boundary of 5.530 m² floor area (road, parking and rainwater drainage, public utility connections, fence, gate) — 1 new 18 m, 60 t load-bearing 6 meter cell MST type road bridge balance with the necessary foundation, building, installing and training the computerised data processing system required for its operation — the purchase of 1 new CXTS 5 t/23 m bridge crane type CXTS 5 t/23 m and the 30 m power supply required for operation of the bridge crane — purchase of 1 new CXTS 5 t/23 m bridge crane type CXTS 5 t/23 m, and the construction of 30 m crane and power supply for the operation of the bridge crane — 1 new, Konecranes CXTS 5 t/29 m bridge crane procurement and construction of 66 m crane track and power supply required for the operation of bridge crane — procurement of 1 new Konecranes CXTS 10 t/29 m bridge crane, 48 m crane track and power supply for the operation of bridge crane — purchase and commissioning of 1 new automatic elbow production line capable of producing welded and curved elbows of high quality and DIN standard size using 2-3 people. — OHSAS 18001:2007 Occupational Health and Safety Management System (MEBIR), developed in accordance with OHSAS 18001:2007, preparation and certification of the system — as part of the complex organisation development programme proposed by an integrator because of the increasing number of employees following the development of the site > business coaching personal and group occupations for 18 months, > psychologist counselling 1 time a week for 12 months, > organizational development advice, covering the following areas: organizational due diligence and planning, management development and efficiency gains, organisational fine-tuning > trainings on the following topics: day-to-day communication, managerial skills and communication, efficiency development, stress and conflict management > market research in the framework of our own completion The CAADEX Ltd. will have the storage capacity required by the integrator after the implementation of the infrastructure investment at the new site in Komló, it will be possible to receive, store, quality control of the raw material, as well as to deponse and prepare the finished product. Once the automatic elbow production line has been installed, equipment will be available to enable us to produce all the elements of the gutter systems supplied to CREATON as part of our own production. The production line will no longer require the purchase of elbows from external suppliers, making delivery deadlines and product quality and price more controllable.