In the project, only activities aimed at increasing the use of renewable energy and the installation of a solar system are carried out for the production of electricity in the grid. The development is carried out in one location, in relation to a building. Following an on-site survey to prepare the project, the technical content of the solar panel system was determined, its installation drawing was prepared and we obtained an independent offer to substantiate the costs. The energy calculation confirms the need for the planned development. Following the development, the annual electricity production is expected to be 160.160 kWh/year, covering about 98 % of the total energy demand of the building. The project does not include activities subject to a building permit, the connection of the photovoltaic system must be approved by the energy supplier during the implementation. Implementation of the project will start after the grant agreement has been concluded. The performance dates will be determined in the contract with the contractor in accordance with the production in the plant building and the contractor’s spare capacities