Start date: 14 December 2017
End date: 31 March 2023
funding
Fund: n/a
Total budget: 55 114 655,36 €
EU contribution: 36 937 842,02 € (67,02%)
programme
Programming period: 2014-2021
Managing authority: NFM Közlekedési Operatív Programokért Felelős Helyettes Államtitkárság
intervention field

Suburban developments on the Budapest-Hatvan railway line

The railway line Budapest, Rákos-Hatvan is part of the Mediterranean TEN-T Core Network Corridor. In connection with the upgrading of the railway line, there are suburban developments on the line section. P+R parking lot is built in Bag, Galgahévíz, City Windmill and Rákoscsaba stops, Pécel and Isaszeg stations. New pedestrian overpass and admission building are being built at Bag stop. The platforms of the railway stations (Pécel, Isaszeg, Aszód, Tura) and stops (Városszélitelep, Rákosliget, Rákoscsaba-Újtelep, Rákoscsaba, Gödöllő-State settlements, Máriabesnyő, Bag, Hévízgyörk, Galgahévíz, Tura) will be upgraded with the development of accessibility. At the stations and stops, platforms, platform roofs, platforms and elevators are built at 55 cm high. Within the framework of the project, related asset and traffic safety measures, project elements supporting the flow of suburban traffic, improvement of the approach to stops and stations will be implemented. The passenger traffic facilities used by suburban traffic will be upgraded. Professional content: • Construction of a new SK+ 55 platform at the town edge station, construction of a platform roof, construction of a new barrier-free pedestrian underpass with lifts, new P+R parking lot construction, space lighting for listed facilities, construction of energy supply. • Construction of a new SK+ 55 platform at Rákosliget stop and construction of a platform roof. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Construction of a new SK+ 55 platform at Rákoscsaba-Újtelep stop and construction of a platform roof. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Construction of a new SK+ 55 platform at Rákoscsaba stop, construction of platform roof, P+R and B+R car parks. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Pécel station construction of a new SK+ 55 platform, as well as construction of platform roof, construction of barrier-free underpass connecting platforms, ensuring equal opportunities with lifts, building station foreground with P+R parking lots, permanent dismantling of pedestrian overpass. Installation of space lighting related to the station, necessary electrical and water utilities. • Isaszeg station construction of a new SK+ 55 platform, as well as the construction of a platform roof, the construction of a barrier-free underpass connecting platforms, and the construction of a station foreground with P+R parking spaces. Installation of space lighting related to the station, necessary electrical and water utilities. • Construction of new SK+ 55 platforms and rainports at Gödöllő state settlements. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Renovation and extension of the existing historic building at Máriabesnyő stop. Refurbishment and expansion of an existing historic platform roof. Refurbishment of pedestrian underpass, construction of an elevator. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Rebuilding the platform at a Bag stop to SK+ 55 cm high, platform roof construction. The construction of a new entrance building at the stop point, the construction of a new barrier-free pedestrian overpass, the construction of a new P+R car park and the construction of a bus turn. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Construction of a new SK+ 55 platform and rainport at Galgahévíz station, design of a new P+R car park • Construction of a new SK+ 55 platform and rainport at Hévízgyörk stop. • The construction of a new SK+ 55 platform, platform roof, barrier-free pedestrian underpass with lifts at Aszód station. Construction of station apron, renewal of track maintenance site and interlocking site. Installation of space lighting related to the station, necessary electrical and water utilities. • Rebuilding a new SK+ 55 platform at Tura station, building a platform roof, a pedestrian underpass, and building an elevator. The construction of space lighting related to the stop, the necessary electrical and water utilities. • Construction of a new traction substation in Gödöllő. • Installation of a new phase separation section on railway line 120a in connection with the construction of the substation Related project (implemented from other grant agreements): — Budapest — Modernisation of sixty and the construction of an ETCS2 train control system CEF-funded project (beneficiary: NIF Zrt.) — Modernisation of Gödöllő station IKOP 2.1 project (beneficiary: NIF Zrt.) — GSM-R II. —Installation of a GSM-R network (beneficiary: NIF Zrt.) — GSM-R I. — Installation of GSM-R network (beneficiary: NIF Zrt.)

Flag of Hungary  Budapest, Hungary