Start date: 15 October 2017
End date: 31 December 2018
funding
Fund: n/a
Total budget: 32 823 614,59 €
EU contribution: 27 900 072,40 € (85%)
programme
Programming period: 2014-2021
Managing authority: Nemzeti Fejlesztési Minisztérium, Környezetvédelmi és Energiahatékonysági Programokért Felelős Helyettes Államtitkárság

Restoration of immunity on the I. Flood Protection Main Defense Lines

The objective of the investment is to: The aim of the investment is to restore protective capacity on the basis of the flooding phenomena recorded in the first order of the main flood protection lines, the autumn 2016 reviews and the flooding events that have been drawn in recent years. Another objective is to balance local weaknesses at bay level in order to achieve equality of strength. This stems from the fact that a significant part of the risk value in each bay is caused by local weaknesses, which are due to subsoil problems and structural problems. As a rupture at such a weak section could even endanger the entire bay, the risk of baying may be high due to high probability. Reason for the investment: Due to the unfavourable soil conditions of the dam body, water appears on the saved side very quickly after the water level has risen on the affected flood protection sections, and as a result, the entire permeation of the dam is occurring. As a result, the persistance of the dam is lost. As a result of several heights and cross-sectional reinforcements after floods, the protective plants were converted into so-called “onion-sweets”, which favour the various layer and contour leaks. The planned interventions within the framework of the investment in the operational area of 10 water departments are technological solutions that can be used immediately to respond to threats on the main flood protection lines of order I. Restoration works: the construction of a damping carpet? construction of a bench? reconstruction of reinforced concrete pyre wall? construction of a clay tooth? — mouth walling (built steel wall)? — plastic sheet insert, locally mixed self-solidating slit wall construction? load-packing? and drain leaking construction. This project contributes to the thematic objective “climate change adaptation, promotion of risk prevention and management” selected under the priority axis “Adaptation to climate change” within the KEHOP.

Flag of Hungary  Baranya, Hungary