The project will develop and expand the Jászapát Industrial and Logistics Park. The development involves road development, development of railway cargo space, development of electricity network, development of communications network, development of drinking water, sewage and rainwater systems, as well as the development of natural gas network. The main objective of the development is to modernise the infrastructure of the Industrial Park, thereby improving the operating environment of the Industrial Park enterprises. The aid application concerns the indicative allocation for Jászság (Jászapáti and Jászberény districts) and Szolnok-Törökszentmiklós-Martfű (Szolnoki and Törökszentmiklós districts) among the development target areas defined in point 1.2 of the area-specific Annex. The project has no foreseeable climate risk. The development involves the development of industrial parks, science and technology parks (in the case of existing parks with titles) of the activities that can be independently supported. In particular, existing industrial parks are constructed, refurbished, refurbished, upgraded, upgraded, upgraded, modernised, upgraded, upgraded and upgraded, creating a running surface, or investing in basic infrastructure outside the boundary of the existing industrial parks (gas, water, sewerage, road track, car park, electrical wiring system, energy network, telecommunications and communication network, waste treatment facilities). 3.1.3 Publicity is ensured among the activities that are not self-eligible and are mandatory. During the preparation of the project and the technical design, the expectations listed in Chapter 3.2 have been taken into account. Content assessment criteria 1. Adaptation to the objectives of the TOP Development is in line with the objectives of the call, it fulfils and contributes to the objectives set out in the call. The subject of the grant application does not fall within the exclusion grounds set out in point 4.2 of the call and point 2 of the document entitled ‘General Guide to Calls’. 2. Professional justification, demand and utilisation The application for support will show the sustainable, economical operation based on local needs. The development of the content of the development concept, its local acceptance, its proper implementation and success is based on a wide-ranging partnership activity. The project includes at least one self-eligible activity. The planned activities will also directly improve the operating environment of established enterprises. Priority will be given to economic dynamising developments in lagging regions with low absorption rates, as well as to employment-enhancing infrastructure developments on the periphery. The project complies with the requirements of the technical-professional content of the Call 3.2 and the requirements for implementation. 3. Start-up/preparedness A business plan is available at the time of submission of the aid application for the investment in respect of the subject of the development and contains appreciable information. The ownership of the property(s) affected by the development was demonstrated by the applicant. development and technical content are supported by a design survey. It can be concluded that the intended function and usability are ensured on the basis of architectural-technical solutions. 4. Risks The structuring and content of each milestone is logically structured and allows the fulfilment of the criteria set out in the call. In the presentation of the development concept, all the investment elements/activities of the development are described, all the necessary preparatory steps and the time required for them. In the presentation of the development concept, consideration was given to what real risk factors threaten the realisation of the development, how likely they may occur, what impact they have on the development, and the potential beneficiary proposes to avoid risk factors. 5. Project complexity The investment includes more activities in synergy than the minimum required, with the help of which the problem identified in the analysis of the situation is approached and solved from several aspects. The development of industrial park and industrial area infrastructure helps to significantly improve the technical and professional conditions of investments, maintain industrial growth and increase its installation, and the investment contributes to the complex, quality development of services. Development activity is in line with the county and local employment programmes of Priority 5. If the building concerned by the development contains dispersed asbestos, the project promoter undertakes to remove asbestos. 6. Impact The investment does not lead to unused capacities and offers long-term solutions to the identified deficit areas. The investment contributes directly or indirectly to employment