project info
Start date: 1 August 2018
End date: 29 January 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 957 800,00 €
EU contribution: 2 805 684,42 € (70,89%)
programme
Programming period: 2014-2021
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Development of the Industrial Park of Kiskunfélegyháza II.

By the end of 2016, in the Kiskunfélegyháza Industrial Park, there was practically no free, infrastructure-based industrial space available for sale to the companies. As a result, it is necessary to expand the municipal business infrastructure and services necessary for local economic development. The TOP-1.1,1-16 call for proposals is an opportunity to support the planned development, to which the development concept of Kiskunfélegyháza Municipality fully matches. In the framework of the project, the municipality has set the objective of implementing phase II of the Industrial Park of Kiskunfélegyháza. Once the project has been handed over, marketable, infrastructure-built free industrial areas will stimulate the job creation capacity of businesses and provide them with conditions to help them operate the local economy. The project will improve the competitiveness of businesses and increase employment in the region. The investment also concerns phase II of the existing Industrial Park of Kiskunfélegyháza, which will be developed in the framework of this project. The area affected by renovation in Phase I of the Industrial Park is 3.4268 ha. During the construction of 1 to 1 port buildings in Phases I and II, at least 30 % of the building’s roof structure will be capable of efficiently installing solar energy devices and at least 50 % of the thermal energy demand will be covered by renewable energy sources. Prior to the construction of the port, a preliminary planning survey was carried out for the buildings in phase I, which found that, due to their location, there was no building suitable for the port function at the planned entrance to the new Industrial Park I phase, so that only new construction could be considered. The greenfield industrial park in Phase II also does not have an existing building near the planned entrance, so naturally only new construction can be considered here. The industrial park phase II areas are classified as GKSZ (economic, commercial and service providers). Total area covered by the development: 30,2834 acres. On the basis of the call for proposals, the areas affected by the development must be industrial or special areas in the urban planning plan of the municipality concerned. Accordingly, the municipality initiates a change in the land use classification. The following works will be carried out under the project: Project preparation — Area preparation — Relief Road construction — 5403 node renovation — 5403 junction road widening — Construction of an excavation road within a new boundary — Construction of a new internal road network and truck parks II. Fence construction — Construction of a new fence II. Purchase of equipment — Construction of a universal tractor with accessories for the operation of the industrial park Porta building — Construction of Porta I — Construction of Porta II — Refurbishment of phase I service building, construction of a public utility network — Water supply D200 backbone construction — Water supply D160 backbone construction — construction of sewage D200 backbone — construction of waste water D200 backbone — Outside natural gas (outside) construction — internal construction of natural gas (within the perimeter) — construction of a transformer station — construction of a basic telecommunications infrastructure public lighting, parking — public lighting (space lighting) II — Parking, garden construction — Installation of wood panel II — Construction of natural gas internal (within the limit) — Construction of a transformer station — construction of a basic telecommunications infrastructure Public lighting, parking — public lighting (space lighting) II — Parking, garden construction — Wooden floor II installation — Road construction • min. 50 cm vtg. 95 % compressed subsoil • 15 cm vtg. sandy gravel bed • 20 cm vtg. CKT premixed cement stabilisation road base • 6 cm vtg. AB -16 j. asphalt binding layer • 4 cm vtg. AB -11 j. asphalt binding layer • 4 cm vtg. AB -11 j. asphalt wear layer • for road refurbishment: (Main road node 5403) • average 2 cm vtg. AB -11 j. asphalt equalisation • 4 cm vtg. AB -11 j. asphalt wear layer 1) main road no. 5403 for road connection • 3 760 m² asphalt renovation (15 eFt/m²) HUF 56 400 000. • For 700 m² road widening (32 eFt/m²) HUF 22 400 000. 2) Exploration trip to the main road 5403 to entrances I and II of the Industrial Park • 3 800 m² (7 m wide) (32,345 eFt/m²) 122 912 721 HUF. 3) Internal road network • 15 054 m² (7 m wide) (32 eFt/m²) 481 718 779 HUF. In order to ensure the safe operation of public utilities (accessibility, access) a road function must be provided by the roads being constructed. Fence construction • 3 200 fm (15 eFt/fm) 48 000 000 HUF. Detailed description of the business plan.

Flag of Hungary  Bács-Kiskun, Hungary