In the framework of the project, a total of 24.690 km will be refurbished on the side of the road network. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 4219 j. road (54+ 110-54+ 300 kms) intervention length: 0.190 km of affected municipality: At the corner of 4219 j. path (38+ 118-40+ 618 kms) intervention length: 2.500 km of affected municipalities: In Mezőgyán 42146 j. access road (6+ 360-7+ 972 kms) intervention length: 1.612 km 4234j r. road (1+ 581-2+ 566 kms) intervention length: 0.985 km 4436 j. road (3+ 960-6+ 020 kms) intervention length: 2.060 km 4429 j. (23+ 434-25+ 314 kms) intervention length: 1.880 km of affected municipalities: Medgyesbodás 4444 j. path (50+ 690-53+ 025 kms) intervention length: 2.335 km of the municipality concerned: Battonya 4429 j. path (43+ 570-44+ 790 kms) intervention length: 1.220 km of the municipality concerned: Orosháza 4231 j. road (0+ 000-3+ 600 kms) intervention length: 3.600 km of municipalities concerned: Dévaványa 4231 j. path (4+ 600-5+ 591 kms) intervention length: 0.991 km 4238 j. road (2+ 477-3+ 975 kms) intervention length: 1.498 km 4431 j. path (27+ 745-31+ 764 kms) intervention length: 4.019 km of the municipality concerned: Beam road 4434 j. (15+ 510-17+ 310 kms) intervention length: 1.800 km The project aims at the renovation and development of 4-5 digit roads, which will improve the availability of localities and jobs in the area, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Csongrád County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road section to be refurbished concerns 7 settlements. Out of the total envelope available under call TOP-1.3.1-15 for economic development and the promotion of labour mobility, the “indicative envelope for the district of Mekovácsháza” will be used for the section between sections 3+ 960-6+ 020 km connecting road 4436 Csaba Szabad — Medgyesbodzás, 4429 Kevermes — Medgyesegyháza — Orosháza connecting road, 4429 between sections 23+ 434-25+ 314 km, and Gyula — Battonya — Mezőhegy road 4444, with an indicative amount of HUF 50+ 690 for HUF 50+ 690. The “indicative envelope for the district of Sarkadi” will be used for the section between sections 54+ 110-54+ 300 and 38+ 118-40+ 618 km connecting road Furta — Gyula 4219, the amount of which exceeds the indicative envelope of HUF 500 million in the call. Evaluation criteria: 1.1. The planned development project contributes to the achievement of the strategic objectives of the county regional development programme: Sub-objectives covered by Table 11 of the Strategic Programme of the Spatial Development Programme of Békés County: Value-based economic development goal: — improving logistical conditions — improving the accessibility of the county Social and economic cohesion objective: — improving accessibility — Improving labour commuting conditions 1.2. Extent of the indicator commitment in proportion to the source: 103 % 2.1. According to Government Decree No 290/2014 (XI.26), the project will be implemented according to the following classification: Ked