As part of the project, a section of the secondary road network will be refurbished for a total length of 10.207 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 3323 j. road (15+ 393-21+ 450 kms) intervention length: 6.057 km indirectly affected municipality: Hajdúnánás 4904 j. path (3+ 500-7+ 650 kms) intervention length: 4.150 km indirectly affected municipality: Nyíradony, Nyíracsád The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to improving road safety, and road safety aspects have been and will be given special attention to road safety aspects during planning and implementation. The investment is part of the Hajdú-Bihar County Regional Development Programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road section to be refurbished concerns 2 settlements. The availability of plans and permits is reported in the project preparation sub-section. The project is in line with the priority and intervention of the county programme, as it develops accessibility, transport networks and public and environmentally friendly transport in Hajdú-Bihar County. The investments improve the accessibility and accessibility of the local industrial park, the M35 motorway and the Semsey Castle (tourism, Balmazújváros). The involvement of the industrial park is also shown in a map annex (annexed).