In the framework of the project, a section of the secondary road network will be refurbished for a total length of 41.87 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 3231 j. road (16+ 500-18+ 618 kms) intervention length: 2.118 km of the municipality concerned: Jászárok Accommodation 4627 j. path (19+ 451-20+ 431 kms) intervention length: 0.98 km of affected municipalities: Martfű 34106 j. access road (0+ 000-2+ 066 kms) action length: 2.066 km of the municipality concerned: Berekfürdő 4202 j. road (14+ 483-27+ 053 kms) intervention length: 12.57 km of the municipality concerned: — 4628 j. road (11+ 955-18+ 500 kms) intervention length: 6.545 km of the municipality concerned: Mezőhék 45112 j. access road (0+ 030-2+ 627 kms) intervention length: 2.597 km of the municipality concerned: Section 3216 j. path (24+ 000-33+ 345 kms) intervention length: 9.345 km of the municipality concerned: Tiszabura 34103 j. access road (5+ 200-6+ 074 kms) intervention length: 0.874 km of affected municipalities: Karcag 34103 j. access road (7+ 250-8+ 775 kms) intervention length: 1.525 km of the municipality concerned: Karcag 4203 j. road (0+ 000-3+ 250 kms) intervention length: 3.25 km of municipalities concerned: Túrkeve The project aims to renovate and develop roads with 4-5 digit degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. In fact, the properties concerned and their ownership can only be determined during the planning process. The project concerns road transport in 1988. I. tv. Shall be planned in accordance with Section 8(1a) taking into account the needs of all operators concerned. In the case of road sections within a residential area, the possibility of safely driving cycling traffic will be examined. The investment contributes to the improvement of road safety and the road safety aspects will be and will be given special attention in the planning and implementation process. The investment is part of the Jász-Nagykun-Szolnok County Regional Development Programme, as well as a link at the level of intervention, with particular regard to priority 2 of the territorial development programme. The list of road sections to be refurbished has been agreed and approved with the county government. Due to the organisation of the Applicant and its expert and institutional background, the financial sustainability of the project and the long-term (5 years) operation and maintenance of the implemented activity are ensured. The technical content of the project will be designed and designed to improve the safety of pedestrians, cyclists and, above all, children, the elderly and people with disabilities. The investment is planned and implemented in a cost-effective manner, with a realistic and economical budget. The investment is carried out through a direct or indirect link to economic development and employment and facilitates the infrastructure conditions for labour mobility. The road section to be refurbished concerns 8 settlements. The availability of plans and permits is reported in the project preparation sub-section. In the immediate vicinity of the developments, there are several holdings or enterprises.