project info
Start date: 11 April 2017
End date: 1 August 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 609 433,53 €
EU contribution: 4 102 395,84 € (89%)
programme
Programming period: 2014-2021
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Road development in Zala County I.

Call TOP-1.3,1-15 for the development of transport for economic development and the promotion of labour mobility, in accordance with the Zala county area-specific annex, in accordance with the total envelope "A.106/2015 (IV. 23) Indicative allocation for disadvantaged districts and settlements laid down in Government Decree No 7539: Dobri-Csömödér connecting road 3+ 270-3+ 820 km and 3+ 820-5+ 120 km, Mumor-Lenti chapel 7422 connecting road 0+ 0-0-0+ 345 km and 0+ 912-3+ 585 km, Zalaapáti-Zalabér road 7352 9+ 760-11+ 660 km and 11+ 660-12+ 300 km, the link road 7537 Borsfa-Lenti takes place between 8+ 650-9+ 550 km, 9+ 930-10+ 400 km, 10+ 400-10+ 900 km and 16+ 800-17+ 500 km, which exceeds the indicative envelope of HUF 590 million in the call. One of the roads in the project is the Dobri-Csömödér connecting road, marking 7539 (according to the NFM ordering). ___ The assessment criteria in point 4.4 of the Area-specific Annex to the Call: 1.1. The implementation of the development will continue to ensure the financial equilibrium of the applicant. YES, 1.2. The financial equilibrium of the applicant will continue to be ensured by maintaining/operating the development resulting from the project in the future. YES, 1.3. A loan/loan is required to complete the project. — NOT 2.1. The development to be carried out is capable of promoting the economic growth of the municipality, the district and the county. — YES, 2.2. The development is suitable for setting up new businesses in a given municipality and agglomeration and increasing the ability of existing enterprises to generate income. — Yes 2.1 and 2.2 apply to all projects by improving the accessibility of labour market centres or by increasing the attractiveness of tourism. 2.4. The investment also renews and modernises at least part of the route used by public transport. — Yes (Annex “Flight numbers of the county of Zala_TOP_day” attached) 3.2. Passenger transport for employment is carried out on the route to be improved. — Yes (Annexes “Flextronics schedules_Zala” and “Flextronics Kft._Zala county_TOP_day” attached) 5.1. The development directly contributes to the improvement of the quality of life of the rural population or the investment includes external development. — Yes Half of the developments are periphery and each improves the quality of life of the rural population. 5.3. The project also includes road safety improvements. — Yes The 7539 Dobri-Csömödér connecting road is 3 + 270-3 + 820 km, the 7422 Mumor-Lenti Chapel connecting road is 0 + 912-3 + 585 km, 73254 Hévíz access road 0 + 450-1 + 450 km, the connection road 7352 Zalaapáti-Zalabér is 9 + 760-11 + 660 km and the 7537 Borsfa-Lenti link road 9 + 930-10 + 400 km contains the construction of a new bus bay. ___ Will be refurbished in the framework of the project on a total of 11.298 km. During the intervention, the profile milling of the existing casing is performed, and the new casing is formed by the installation of a binding and wear layer. The drainage is ensured by refurbishing the existing drainage system and by placing it in a good arm, and the road bench is also arranged. Works of art, penetrating and traffic equipment on the affected road sections will be refurbished as necessary. Refurbished sections: 7539 j. road (3+ 270-3+ 820 kms) intervention length: 0.550 km of the municipality concerned: Tormafölde 7539 j. path (3+ 820-5+ 120 kms) intervention length: 1.3 km of municipalities concerned: — 7422 j. road (0+ 000-0+ 345 kms) intervention length: 0.345 km of the municipality concerned: Lower-Mumor 73254 j. access road (0+ 450-1+ 450 kms) action length: 1.0 km of affected municipalities: Hévíz 7422 j. road (0+ 912-3+ 585 kms) intervention length: 2.673 km of the municipality concerned: Lower-Bárszentmihályfa 7352 j. road (9+ 760-11+ 660 kms) intervention length: 1.9 km of municipalities concerned: — 7352 j. road (11+ 660-12+ 300 kms): 0.640 km of the municipality concerned: — 7405 j. road (7+ 480-7+ 800 kms): 0.320 km of the municipality concerned: — 7537 j. road (8+ 650-9+ 550 km) intervention hossz:0,900 km concerned: — 7537 j. road (9+ 930-10+ 400 kms) intervention length: 0.470 km of the municipality concerned: In Lispeszentadorján 7537 j. path (10+ 400-10+ 900 kms) intervention length: 0.500 km of the municipality concerned: 7537 j. road in Lispeszentadorján (16+ 800-17+ 500 kms) intervention length: 0.700 km of the municipality concerned: Páka- Dömefölde The project aims at the renovation and development of 4-5 digit roads with degraded conditions, which will improve the availability of settlements and jobs in the region, thereby encouraging labour mobility and economic development. Investments are made on the public road network. The properties concerned and their ownership are in fact only planned

Flag of Hungary  Zala, Hungary