The project includes the implementation of the following activities within the framework of the green regeneration of Mohács Szepessy Square and its surroundings.The detailed description of the activities is included in the assessment of needs attached as well as the concept plan. Reconstruction of the plant stock of Szepessy Square and its surroundings.Gross 92 506 800 Ft.Custom treatment of trees (care work):gross 4 610 100 HUF,gyom control/patient trees eltávolítása:bruttó 4 610 100 Ft.Total:gross 101 727 000 Ft.3.1.1.A.d:Sport-covered runway in Szepessy Park.Bruttó 42 672 000 Ft.Development of a playground with wooden construction covered in Szepessy park.Gross 34 925 000 Ft.Development of a free-air gymnastics course in the Szepessy park.Gross 34 925 000 HUF.Development of the urban educational path in Szepessy Park.Gross 41 986 200 Ft.Total: gross 154 508 200 HUF.3.1.1.B.I.c.2:renewal of the sub-utilised part of a building owned by the local government, the aim of which is to create a profit-making sports and leisure hall. Construction: gross 6 794 500 HUF, related eszközbeszerzés:bruttó 1 333 500 HUF, a total of 8 128 000 HUF.Ineligible, non-eligible, optional tevékenységek:3.1.2.c:a Reconstruction of artifacts bearing the style marks of Szepessy park.Gross 3 810 000 HUF.3.1.2.d: the function of the green surfaces to be renewed, structures and works that interfere with the overall image of the building bontása:poller,betonasztal,kút,pad.Bruttó 635 000 Ft.3.1.2.i: purchase of appropriate quality street furniture, grains, benches and boards required for the proper use of the green surfaces to be renewed.Gross HUF 13 970 000.3.1.2.k: outdoor recreation facilities kialakítása:hűsölőpont,ivókút.Bruttó 6 527 800 HUF.Establishment of parking spaces required for all main activities.Gross 9 525 000 HUF.3.1.2.3:Renovation of the municipal road to support the use of green areas.Guttó 93 005 131 HUF.3.1.2.3.a:Renovation of pavements to assist the use of green areas, design.Gross 18 527 268 HUF.3.1.2.3.b: refurbishment of parking spaces supporting the use of green spaces.Gross 4 864 100 HUF.3.1.2.3.c: refurbishment of the bus waiting room for the use and integration of green spaces into the network.Gross 7 620 000 Ft.3.1.2.3.d:Development of the park promenade ensuring the accessibility and interoperability of the green area.Gross 12 401 550 HUF.3.1.2.3.g: installation of bicycle storage facilities to support the use of green space.Gross 2 540 000 Ft.3.1.2.4.energy-saving modernisation of street lighting.Gross 19 050 000 HUF.3.1.2.6. Design of a camera system to improve public safety.Gross 3 810 000 HUF.Independently ineligible, mandatory tevékenységek:3.1.3.a:nem relevant.3.1.3.b:Not relevant.3.1.3.c:The entrance and toilet of the sports hall to be built as part of the project is still accessible.All improvements are made by the applicant taking into account the principles of accessibility. Enhancing environmental awareness and an integrated approach among the population.Gross 3 810 000 Ft.For a detailed description of soft activities, see Costs menu item.Compliance of the conditions set out in point 3.2 of the call:the applicant in the mandatory main activity “A” implements project elements related to points (a) and (d) as described above.In the case of “Building” main activity, the “Building” key activity is implemented as a recovery and municipality-owned development in the project, the project is 100 % owned by the applicant municipality for underused building income generating, sporting and leisure-related renewals.In respect of each infrastructure interventions, the amount of the land-accounting is not increased in the amount of the amount of the Recycling of the number of assets presented above, and the number of the assets of the Recycling project is increased in the following areas: the number of the project’s netting-emergency ratio: the number of the city-owned projects: the 100 % owned by the applicant municipality is 100 % owned by the municipality of the underused building for income generating, sport and leisure purposes.In respect of each of the infrastructure interventions related to points (a) and (d), as described above, the amount of the landmarking of the project’s number of assets is increased in the following areas of the project, including the amount of the amount of the project, including the amount of the amount of the project, including the amount of the project.