The overall objective of the project is to implement the development aimed at creating a liveable settlement environment, protecting the natural and built environment and improving the quality of life and environmental conditions of the population, as a result of which the population retention power of the settlement increases. Another objective is to carry out developments aimed at protecting the urban area, which contribute to the objectives set out in the BAZ County ITP and the interventions ensure the achievement of the objectives set out in the Lucky ITS, in accordance with the provisions of the existing urban planning instruments. The aim is to develop systems for the orderly and unharmed drainage of rainwater falling into the inner area, in this circle-developing inland water drainage systems in the part of the settlement that is at risk of inland water in the area of the settlement — development of external and inland systems protecting the internal area of the settlement from the adverse effects of the waters coming from the outskirts of the urban area — the termination of the connection of rainwater collected from part of the urban urban area to the urban sewage pipeline, and the organisation of an awareness-raising action for the public target population living in the target areas, and the organisation of awareness-raising actions aimed at raising awareness of urban river basin management. The present grant application is intended to obtain the resources necessary for the implementation of the next phase of our water planning plans. These project elements relate to the action areas designated in the City’s Integrated Urban Development Strategy, which was completed in 2015, and are presented as a specific objective in the action area plans. The planned development fits with the target system of the Municipality’s Integrated Urban Development Strategy, which is detailed in PET.The municipality concerned with the grant application has a water damage prevention plan.The organisation submitting the grant expresses a sense of chance in its communication and behaviour, does not mediate segregation, reduces prejudices. Compliance with the conditions laid down in the section of the call’s content assessment criteria, detailed technical and professional content, equal opportunities and sustainability, conditions of operation, preparation, implementation schedule, details and justification of the budget, will be presented in the pet. It has taken into account the project’s mitigation and adaptation potential and ensures that the project is resilient to climate change and natural disasters, requiring support. It was considered whether the implementation or outcome of the project would be endangered by an extreme weather event. As a result of the assessment, it was concluded that the project does not have a foreseeable climate risk. The project complies with all environmental and equal opportunities legislation and has no impact on energy use, environmental status of the project environment, water status and climate change.Investment presentation: Total length of security installations under construction: 2003 fm Project element 1: Ondi drainage system development, project element 2: Mill trench development, project element 3: Development of Diósi trench system — Organising the drainage/overflow channel of Lake Várkerti, 4th project element: Development of Diósi ditch system — elimination of unified sewage and rainwater drainage system. Within the framework of the project, the involvement of 6 disadvantaged residents was planned in the construction works in such a way that the Applicant was the Kbt. In the case of an investment falling within its scope, it adapts its invitation to tender in such a way that the bidders are obliged to employ disadvantaged residents in the construction works. The technical content of the project corresponds to the territorial conditions and the content of the project is in line with the regional river basin management plan. The value of the built environment in the protected area exceeds the declared cost of the project. The development of 123/1997. According to Government Decree/VII.18./The protection area of vulnerable water bases is also affected by project element 3 of the development- drainage of Lake Szerencs Várkerti, owned by the Municipality of Szerencs, and in the environment of a shallow-deep drinking water well in Serencs, located in the operation of Borsodvíz Zrt. and registered as a vulnerable water base at the time of submission of the grant application. The development does not affect settlements in groundwater protection areas which are particularly sensitive or highly sensitive to groundwater. It concerns municipalities classified as sensitive under the relevant legislation. The development also affects an area with high groundwater status, because the site of implementation of project element 2, i.e. the section of the Malomárok above road 37, is characte...