Within the framework of the project, the building of the Bount Albert Primary School will be developed for energy purposes. Address of the building: Jászberény, Bajcsy-Zsilinszky street 1. hrsz.5276. The property is municipal property. Intended technical content: The building’s facade is thermally insulated in EPS system, in the thicknesses of the Energy Certificate. Replace the aged Single-winged wooden windows, as well as the outdated metal glass walls with 6-chamber plastic structures, with 3 layers of thermal insulation glazing. In the previous developments, we leave suitable plastic doors and doors in the built-in thermal insulation and the new thermal bridge-free aluminium portal. Among the flat roofs, we renovate the original parts in a completely new layer, leaving the parts previously converted to heat-insulated and mildly inclined roofs in their current state. The renovation of these roofs cannot be carried out economically. The aged boilers are replaced by condensation, the radiators are controlled by valves. The existing gas boiler system in the school’s mechanical premises and the hot water storage system will be dismantled and a new condensation gas boiler system and hot water storage group will be installed instead. The gas boilers (2 pieces) are wall-placed, which are equipped with an external circulating pump. The gas boilers work on a hydraulic transmission (through their own circulating pumps), which is connected to the secondary side of the hydraulic transmission by the remaining heating system, via a new circulating pump or pumps to be installed. The newly installed hot water storage group is also supplied from the secondary side of the hydraulic transmission. The project complies with the equal opportunities and environmental standards set out in point 3.2 of the call. The project has no foreseeable climate risk. The project has no impact on the status of the water, and no water rights permit is required. The technical design documentation and the complete project preparation were prepared on the basis of the criteria for the development of the project described in this chapter. The project meets the other evaluation criteria 1.1-1.7, 2.2, 2.3, 3.2, 3.3, 3.4, 4.1-4.4, 5.1, 7.1, 7.2, 10.1-10.6 The planned development fits the goals of the TOP, professional justification, demand and utilisation are appropriate. The project is well founded. Potential risks have been analysed. The project does not involve the development of a monument building. The project meets the sustainability criteria. The project is linked to projects of other OPs and other measures of the TOP. The project is carried out in settlements with more than 10,000 people. The investment is not excluded for any social group. The financial internal rate of return (IRR) is between -4 % and 4 %. The pre-development energy demand of the buildings concerned exceeds 150 kWh/m2a. Area-specific aspects 1. The 5.2.1 intervention of the Jász-Nagykun-Szolnok County Regional Development Programme is the development of educational and educational institutions, i.e. a link with the Programme at the level of intervention. 2. Contribution to the internal territorial equilibrium The energy modernisation of the property affected by the development took place more than 10 years ago. The development is carried out in the beneficiary district under Government Decree No 290/2014 (XI.26). 3. Contribution to economic growth The energy savings achieved as a result of development are above 20 % compared to the average over the last 3 years 4. Contribution to the creation of jobs The planned development is not linked to the production of energy carrier or the processing of live labour activities on the ground.