a) The aim of the project is to promote more efficient energy use and rational energy management of municipal institutions, including: — Renovating and developing buildings with 100 % municipal ownership for energy efficiency, reducing greenhouse gas (GHG) emissions from fossil fuels — increased use of renewable energy sources b) the technical and technical content of the project, together with the presentation of the selected self-eligible and ineligible activities: (a) Energy efficiency-oriented development of municipal buildings through the modernisation of their external boundaries — Improving the thermal characteristics of buildings, Decree No 7/2006 (V. 24.) of the Minister for Transport, in force at the time of publication of the call (hereinafter: In accordance with the requirements of Section 6(5) and (6)(b) of Decree No 155/2014 of the Minister for Transport and Rural Development, in accordance with the requirements applicable to the use of “home or EU tender resources”, the retrofitting of external boundaries, the replacement or upgrading of external doors and windows or the improvement of the summer and passive heat protection of buildings. —external insulation, replacement of doors and windows (d) Design of a small household-size power plant (HMKE) photovoltaic system to meet its own electricity demand: — the purchase and installation of solar panels and their supporting cells; reinforcement of the relevant load-bearing elements of the roof structure based on a static opinion; the purchase of the elements necessary for connection to the local electricity system and to the grid shall be the costs of the network developments which are essential for internal connection and the costs of their deployment; equipment for measuring and recording electricity produced. — solar system with a total output of 11.2 kW per building. Optional activities that are not eligible on its own (h) Modernisation, replacement and/or upgrading of related heating and HMV systems — upgrading and replacement of heat production facilities (replacement of existing fossil-based heat generators for a more modern fossil-based heat generator or installation of a biomass boiler system); — secondary mechanical upgrades of fossil-based district heating buildings — modernisation and replacement of heating and HMV systems; — modernisation of heat take-off equipment, replacement of mechanical upgrading, self-eligible, mandatory activities (a) Accessibility — where relevant, in Chapter 3.2 of this call, on the basis of accessibility criteria (c) Providing publicity — in Chapter 3.2 of this call, on the basis of the conditions for publicity (d) Development of training material, provision of training — Chapter 3.2 of this call, on the basis of the conditions governing the provision of training; Asbestos removal and monument protection are not relevant. compliance with the conditions set out in point 3.2 of the notice: due to lack of character, the Project Plan explains (d) the fulfilment of the conditions laid down in the section of the call’s content assessment criteria: due to lack of character, in case of standard procedure e) the qualification of the project by area-specific assessment criteria is explained in the Project Plan: due to lack of character, technical and professional results will be explained in the Project Plan: The implementation of the project will result in the energy-efficient renovation of 3 buildings, which will allow the construction of CC-rated buildings.