Start date: 1 July 2018
End date: 31 August 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 159 799,73 €
EU contribution: 135 829,77 € (85%)
programme
Programming period: 2014-2021
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Energy modernisation of nurseries and nurseries of Kiskunfélegyháza using renewable energy

The objective of the project is the building of 7 kindergarten and 2 nursery institutions maintained by the Municipality of Kiskunfélegyháza (Dankó Pista street Bölcsőde, Darvas Square Bölcsőde, Kiskunfélegyházai Daycare School — Dózsa György Street Tagó kindergarten, Kiskunfélegyházi Daycare School — Bercsényi Street Tagóvoda, Kiskunfélegyházi Kindergarten — Kossuthvárosi Tagóschool, Kiskunfélegyházi day-care nursery — Móravárosi Tagó kindergarten, Kiskunfélegyházi day-care nursery — Nagyszőlő út Tagó kindergarten, Kiskunfélegyházi day-care nursery — Kindergarten in Darvas tér, Kiskunfélegyházi Day-care centre, Kiskunfélegyházi day-care centre — Bankfalui Tagó kindergarten, thereby ensuring energy saving and cost-effective operation of the buildings. Within the framework of the project, a system of maximum household size per building will be installed, with a planned 88 kW inverter output for the entire project. — Technical and technical content of the project: D) Maximum household-size small power plant (HMKE) design of a photovoltaic system to meet its own electricity demand The Call 3.1.2.1. Mandatory non-eligible activities to be carried out on its own: C) Providing publicity d) Developing training material, holding training e) Preserving historic or locally protected value The Call 3.1.2.2. Optional, ineligible actions: such activities are not included in the project. The project was designed to meet the technical and professional requirements of the Call, taking into account the criteria set out therein. The activities planned in the project are based on measurements and suggestions from energy professionals. The project has no climate risk and no negative impact on water status. The ineligible function in the building does not operate. The buildings are not protected locally. The project summary of the development plan and its annexes are attached.

Flag of Hungary  Bács-Kiskun, Hungary