Kohesio: discover EU projects in your region

project info
Start date: 1 June 2019
End date: 15 February 2021
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 72 468,15 €
EU contribution: 61 597,93 € (85%)
programme
Programming period: 2014-2021
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága

Energy modernisation of municipal buildings in Sárospataki

In line with the Europe 2020 strategy, the National Energy Strategy 2030 and our country’s objectives, the Municipality of Sárospatak has given high priority to promoting sustainability, with particular emphasis on reducing greenhouse gas emissions and maximising the potential of the transition to renewable resources. Within the framework of the present project, the energy development of 2 buildings, which are 100 % owned by the Municipality of Sárospatak, and fulfil the functions eligible under this call, will be realised. Project implementation sites and content of the investment: 1. Móricz College (3950 Sárospatak, Arany János u. 3-5 hrsz. 5.) Function: College (Invitation 3.4.1.1. 3. (a) Maintenance: Sárospataki School District Centre Planned investment: 25 kW peak power solar system installation. The system consists of 88 pieces of Eco Delta 280 Wp solar modules, 2 ABB PVI-12.5-TL-OUTD-S inverters and the necessary DC junction box with overcurrent and overvoltage protections, solar cabling and support structure. 2. Seat of the Communal Organisation Sárospataki (3950 Sárospatak, Dózsa György út 2. hrsz. 3654) Function: Registered office of the communal organisation (Invitation 3.4.1.1. 3. n) Maintenance: Municipality of Sárospatak Designed investment: Installation of a solar panel system with a peak power of 20 kW. The system consists of 72 Eco Delta 280 Wp solar modules, 1 ABB PVI-12.5-TL-OUTD-S inverter, 1 ABB TRIO-7.5-TL-OUTD-S-400 inverter and the necessary DC junction box with overcurrent and overvoltage protections, solar cabling and support structure. After its implementation, absolute greenhouse gas emission reductions and energy carrier savings are projected. The result of the project is 172.57 GJ/year of energy from renewable sources, a decrease in primary energy consumption of 119 840 kWh/year, an estimated annual reduction of greenhouse gases: 44,81 CO2 equivalent (t). Training: The users of the 2 affected buildings will be informed about the technical solutions, the correct operation of the new solar systems and the expected environmental benefits, with the help of an energy expert, 1-1 times during the month of the project’s closure. 10-10 brochures are placed on the premises to help self-learning. The project has no foreseeable climate risk. The project includes the costs of mandatory infocommunication accessibility, the implementation of physical accessibility is not relevant for our project. The costs of the project include mandatory information and publicity, as well as project management costs.

Flag of Hungary  Borsod-Abaúj-Zemplén, Hungary