The overall objective of the interventions to be implemented under the project is to prevent further segregation in the action area involving segregation, to improve the living conditions of the people living in the action area, to address their socio-physical and economic problems in a complex way, to promote the individual and community integration of the people there, to implement complex infrastructural interventions tailored to the needs of the target group, taking into account and ensuring equal opportunities, and in synergy with project TOP-5.2.1-15-BA1-2016-00001. The specific objectives of the project proposal are: improving housing situation, improving community functions, improving access to services, improving public space functions, improving public safety, anti-discrimination. In order to achieve the above objectives, we plan to implement the following activities: Call 3.1.1. I.A. b): The modernisation of 48 social housing units, owned by the Municipality of Mohács, located in a segregation located in the territory of Újváros. Call 3.1.1. II. 1) a): The renovation of the social housing in the segregation area, owned by the Municipality of Mohács, will be carried out, and furniture will also be purchased. After the renovation, the social worker contracted for this purpose during the period of implementation and maintenance of the project also performs the continuous assistance work in accordance with the related project No TOP-5.2.1-15-BA1-2016-00001 entitled “Complex programs at local level to strengthen social cooperation in Mohács Újváros”. Call 3.1.2. (A) (b) to (c): As part of the activity, the missing community building on the action area will be built on the southern side of the Pécsi út bordering the action area. The building also serves as a social worker office space, and the purchase of related equipment is also carried out. Call 3.1.2. (B) (b): As part of the activity, 4 surveillance cameras will be installed in the action area. The camera images will be made available in the existing surveillance centre. Call 3.1.2. (D) (c): The activity includes the construction of a basketball court, resting place, refurbishment of the playground, renewal of green surfaces, quality utcabútorok:padok, disposal of garbage cans. Call 3.1.2. (D) d): The activity involves the demolition, refurbishment of the sidewalks in the action area and the renovation of the urban road network in the action area in order to ensure equal access to public services. Call 3.1.2. (D) f): In the framework of the activity, we plan to develop modern, energy-saving public lighting by transforming the existing network and creating a new network. Call 3.1.2. (D)h): The activity involves the refurbishment of sewage and drinking water supply pipelines. Call 3.1.2. (D) j): Within the framework of the action, the mandatory (minimum) number of parking places and unobstructed parking places in accordance with the applicable legislation will be established in respect of the buildings affected by the development on the basis of points 3.1.1 and 3.1.2 of the call. All interventions have been designed taking into account the principles of energy efficiency and accessibility, and the public will be provided as required during the implementation of the project. Asbestos removal is not relevant for the project. Compliance with the conditions set out in point 3.2 of the call: The action area to be developed under the project is included in the ITS, the project is in line with the ITS, the Anti-Segregation Programme and the HEP, with which the project preparatory study is described in points III.3.1-3 of the Project Preparatory Study.The development involves exclusively action area interventions.The development focuses on segregation, the entire area of which is included in the action area. residential function activities are created in the segregation area, with the effect of the project, the number of dwellings in the action area is not increased. Due to lack of space, compliance with the content evaluation criteria of the call, as well as the area-specific assessment criteria, will be presented in the Preparatory Project Study.