We would like to submit our present support request for the complete renovation of the Vadvirág Membership of the Consolidated Nursery School in Salgótarján, under the authority of the Municipality of Salgótarján. The kindergarten operating in Zagyvarón in the periphery of the town serves the needs of those living in a green environment (Salgótarján settlements — Zagyvaróna, Rónafalu, Rónabánya, Szilváskő, Pintértelep). In an institution with 60 places, the number of users is projected to be ensured on an ongoing basis. Due to its territorial and environmental location, the institution is very popular; it can be said that parents prefer a kindergarten in a green, “falusias” environment. A sufficient number of educators provide a high level of education in the institution, who carry out their daily activities along the lines of the reception-principle (education of children with integration, behavioural difficulties, special educational needs and disadvantaged backgrounds). The building was built in 1912. There has been no significant improvement in the institution since the 1980s, apart from the necessary renovations. Due to the existence of the building, the whole building needs to be renovated. During the construction, the building will receive a new shell and a new tin structure. The sanitary facilities and other service spaces within the building are relocated. By relocating the premises, new partitions, opening breaks, opening narrowings and opening wallings are created, thus eliminating overcrowding, taking into account future expected needs. There are floor differences between the floor levels of the rooms, which need to be raised to the same level as the floor levelling. After repairing the facade plaster, the thermal insulation of the outer wall is made after repair, the doors and windows on the facade of the building are of wood and plastic structure, so it is necessary to replace it with modern insulated glazing. Complete electrical and mechanical wiring and fittings are to be replaced according to new standards and due to their outdated and insufficient energy-saving performance. We replace the avultated central heating system of the building with a modern closed fronted, hot water boiler, natural gas fuelled boiler. During electricity renovation, renewable energy utilisation is planned by installing solar panels, which provide electricity to the grid. In the building, the light sources are replaced with LEDs. During the renovation, due attention will be paid to project-proportional progression. At present, the building is not available at all by wheelchair or stroller. During the renovation, a safe, barrier-free ramp will be installed in the northern part of the building to ensure access to the building. In the course of the project, a gym room of sufficient size will be created in the building, using the part of the building that is currently underutilised. The rooms used by the educators will also be adapted. The procurement of both internal and external assets was planned in the project. Since the institution has a garden of around 8000 square meters, it is advisable to pay due attention to the development of the outer space from the point of view of healthy education, so we give priority to the functional utilisation of the space. The project design took into account the consideration of potential risks. It can be said that the project has no foreseeable climate risk and is not endangered by extreme weather events.