Due to the geotechnical properties of the soil (soils of loess and loess), a significant part of Dunaújváros is located in an area with unfavourable properties. Due to the problems briefly summarised below, the collection and proper drainage of surface waters in Dunaújváros is of particular importance. At the high banks, the deterioration takes the form of slippages, crumblings, breaks and sinks in other areas of the city. The collection and draining of surface water is not possible in a significant part of the Camp Coast. In order to regularise the situation, we intend to implement the rainwater system in part of the coastline in the framework of this project. Self-eligible activities under the project: A) Developing a drainage network for the protection of the inland area, taking into account the objectives of rainwater management. (a) the refurbishment, reconstruction and construction of structures and bridges forming part of the drainage system justified for the protection of the inland area. b) Establishing, refurbishing and developing a separated rainwater drainage network, including: construction of an open rainwater drainage system or inland water drainage network with bed construction, restoration, reconstruction and restoration of structures, as well as construction of closed rainwater drainage system only in justified cases (e.g. due to lack of space by showing it), refurbishing and, in justified cases, construction of a water drainage road. Necessary interventions on the receiving watercourses in order to protect urban areas. Mandatory activities that cannot be independently supported under the Call: a) A) Providing publicity and information action complementing infrastructural interventions. Optional, ineligible actions: B) the restoration of the road network directly affected by the construction of the rain canal network, the pavement, pavement, gateway and parking surface affected by the construction of the project with the same type of pavement as before the investment (renovation of the entire road surface is possible only in justified cases), rebuilding and extension of recesses. e) planting and restoration of plants in the area belonging to the facilities, including the coastal lane according to the regulations (in the area under natural protection, the selection of species to be planted must also take into account the landscape and natural characteristics). f) construction, reconstruction, reconstruction and reconstruction of crossroad structures, if justified. The planned investment is in line with EU Thematic Objective 5, which aims, among other things, to establish and develop the drainage management system of urban rainfall water in towns with county rights, to reduce the risk of local water damage and to prevent further environmental damage. In line with the above objective, the objective is to ensure the orderly and unharmed drainage of rainwaters and eruptive waters falling into the inland area.