It’s the beruh. The town of Székesfehérvár touches the nearly 320 years old monumental building of the town of Székesfehérvár (in kind at Town Hall Square No. 1, inner area No. 382., Monument number: 1552 and 1520).In the course of the planned works, Decree No 7/2006. Energy renovation is carried out in accordance with the requirements laid down in Section 6(5) of the Decree of the Minister for Transport (V.24.)TNM.In the building built, restored and partially refurbished so far, investment for complex energy purposes has never been realised, despite the fact that the complex is one of the oldest buildings and iconic monuments of Székesfehérvár. Based on the preliminary internal survey carried out for the building, the annual value of CO2 equivalent emissions in the current state of the building could decrease to 212.44 t/year, if the planned development is carried out, to 143.78 t/year. The calculation shall be considered to be final only if the mandatory energy expert/technical surveys are carried out. In the framework of the survey, the project preparation procedure and the finalisation of the project plan-authentic energy certification, due to the historic nature of a complex project expert screening is required. Based on the above, the energy renovation of the polg. GHG emissions are expected to be reduced in the building of the Office of 68.66 t/year. Energy refurbishment includes (1) the restoration of metal structures and the carrying out of clasp demolition and restoration works, and the restoration of stone and wall structures as well as related demolition and restoration works. 3.)the surface finish of the facade of the building, which includes the elimination of the wetness of the walls, the subsequent insulation of the walls, the crushing of stale plaster parts, the new preparation, tinting, in connection with this, the thermal insulation of the closing ceiling, the thermal insulation of the flat roofs of the building. 4.)the most part of the energy savings is the development of a solar system designed for the roof surface, for which (5)) the reinforcement of the roof structure (the performance of roofing and tin work) and the replacement of the shells are necessary. 6.)part of the arrows of the building has already been replaced in recent years, and the remaining doors are replaced as part of this complex reconstruction. 7.)with the installation of the solar system, it is essential to renovate the building with high-voltage, new wiring, distributors and fittings, as well as the modernisation of the electrical network system, to install new energy-saving luminaires. 8.)as well as the building’s plinth and flat slab waterproofing. Renovation works do not include obstruction tasks. As far as we know, the relevant structures of the building do not contain asbestos, but the relevant examination will be carried out in the course of the proj. Prior to the submission of the application, the preparation of the project was not started, and the project’s proposal is submitted only with the presentation of the project idea. According to the relevant general meeting decision, the preparation of the project can start with the positive decision of the sponsor, or the implementation of the project may take place after its preparation. In the context of the preparation, it is therefore necessary to prepare (9) the building energy audit, 10) using experts with the appropriate authority, and (11) the building energy certificate of the existing state, 12) using experts with the appropriate authority. Following the completion of the expert tasks, the total number of permit-holder plans for the complex energy project may be prepared, in parallel the 14th project plan, as well as the 15th) the construction plans, and (16) the static expert opinion, which examines the load-bearing capacity of the roof in connection with the installation of the solar panel system. Once the preparatory activities have been carried out, the technical plans of the tender may begin, on the basis of which the contractor with the appropriate references will be selected during the conduct of a public procurement procedure. In the framework of the implementation, all the above-mentioned activities Nos. 1)-8) will be carried out in the framework of technical and technological considerations in the framework of work that is based on one another or in parallel. As part of the performance of the professional services, (17) the technical inspector supervises the implementation of the relevant technical content and (21) performs the tasks related to the provision of mandatory publicity. A new 20th) ener. certificate and 18) building energy audit will be carried out during and after completion of the proj. payment. The priority aspect in the course of the proj. payment is that the values of the building subject to the project to be protected from a historic point of view may not be damaged during the implementation of the project, and the va...