Kohesio: discover EU projects in your region

project info
Start date: 31 January 2018
End date: 30 April 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 366 199,00 €
EU contribution: 1 689 229,47 € (71,39%)
programme
Programming period: 2014-2020
Managing authority: Nemzetgazdasági Minisztérium, Regionális Fejlesztési Programok Irányító Hatósága
intervention field
European Commission Topic

Rehabilitation of degraded urban areas of Miskolc — Iron Factory Program

Rehabilitation of degraded urban areas of Miskolc — Iron factory program Technical content: — The demolition of 38 apartments under no. 42-56 Kabar Street, 18 properties were occupied under No 42-56 Kabar Street. Moving the people here, creating more quality living conditions for them. — Renovation and insulation of municipal social housings located in the segregates of the action area (segregates Nos 7, 9, 11), Pushkin u. 26-28, Puskin u. 31, Glanzer Miksa u. 22-24 and Glanzer Miksa u. 26-28. A total of 12 apartments. — Another 30 social housing units will be refurbished in an integrated area, as planned. (In parallel with the submission of the aid application, the housing in the area is being assessed for the purchase of real estate. If there is a possibility to buy real estate in segregates, then the properties purchased will be refurbished, while those dwellings that are not recommended for renovation due to their poor technical condition will be demolished in the same segregation. During the project development period, the proportion of apartments to be renovated in the action area segregates and the integrated area may vary.) — Green surface update, landscape (copy map attached from the site), where 1 Eu-standard play and sports equipment is “installed”. Topographic numbers for parking: 23415; 23422; 23427/5. — Partial renovation of the Community House at Vasgyári út No 24. The building is under local character protection. Therefore, a thorough assessment is required both for insulation and for the accurate determination of our technical work and interventions. After the completion and completion of these works, we can provide precise technical content. Only part of the Community House will be renewed. Overall, the aim of the project is to: — Renewal of degraded neighbourhoods with social reintegration and reintegration of affected populations. — Modernisation of semi-comfort local government-owned social housing in poor condition. — Demolition of residential properties that are in poor condition and are not worth renovation. — The organisation of an empty green space owned by the local government, the establishment of a playground, parking. — The creation of a covered community space, along the lines of the Avasi Community Space. We would like to inform you about the filling of the gaps in the indicators: ARTICLE 1562/2015 (VIII. 12) Government According to Annex 2 to Decision No 2 of the Municipality of Miskolc, the target to be met by the Municipality of Miskolc on the basis of priority axis TOP 6.G in relation to the indicator “Restored residential units in urban areas (residential unit)” by 31 October 2018: 9 housing units and 42 housing units by 2023. If the property(s) concerned by the development contains dispersed asbestos, then we undertake the removal of asbestos.

Flag of Hungary  Borsod-Abaúj-Zemplén, Hungary