Kohesio: discover EU projects in your region

project info
Start date: 8 August 2019
End date: n/a
Project website: link
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 000 000,00 €
EU contribution: 500 000,00 € (50%)
programme
Programming period: 2014-2021
Managing authority: Ufficio per l'integrazione europea

PROTECTION FROM FLOODS ALONG THE AURINO IN PREDOI -LOTTO 4

IN THE CONTEXT OF THIS PROJECT, THE LEFT OROGRAPHIC AURINO SAFETY EMBANKMENT AT THE HEIGHT OF THE AUER FARM IS RECONSTRUCTED AND ADAPTED TO THE ALTITUDE OF THE LAND. ON THE BASIS OF A LIMITED AVAILABILITY OF SPACE, RAISING THE LIGHT OF THE BRIDGE LEADING TO THE AUER FARM COULD NOT BE CONSIDERED AND SO THE LOWERING OF THE RIVER BED DUE TO THE PRESENCE OF THE NEIGHBORING HOUSES WOULD BE VERY EXPENSIVE, IT WAS DECIDED TO DEMOLISH THE EXISTING BRIDGE AND REBUILD IT A LITTLE MORE DOWNSTREAM, SO THAT THE HYDRAULIC SECTION CAN BE ADAPTED TO THE CALCULATED OUTFLOW SECTION. FROM SECTION 994,00 TO SECTION 685,00 THE OUTFLOW SECTION OF AURINO WILL BE INCREASED. THE OUTFLOW VALUE CONSIDERED REFLECTS THE VALUE OF TR 300 (180 M³/S). THE OLD ACCOMMODATION AT THE RIGHT OROGRAPHIC EMBANKMENT WILL BE REMOVED AND REPLACED BY A NEW EMBANKMENT IN CYCLOPIC BOULDERS. TO ENSURE THE SAFETY OF FLOODS, ROAD BARRIERS WILL BE REPLACED BY A CONCRETE WALL

Flag of Italy  Italy