Kohesio: discover EU projects in your region

project info
Start date: 1 September 2016
End date: 31 December 2022
funding
Fund: Cohesion Fund (CF)
Total budget: 1 273 227,92 €
EU contribution: n/a
programme
Programming period: 2014-2021
Managing authority: Služba Vlade RS za razvoj in evropsko kohezijsko politiko
intervention field

CTN NM Brv and Cycling Route — Irča vas

As part of the investment, the construction of a multifunctional footbridge (length 138.4 m, 4 m wide) is planned to cross the Krka River between Lastovče and the settlement of Groblje on the left bank. At the same time, the construction of a cycling route (length 190 m, 4 m wide) is planned on the left bank of the river Krka, which will connect to the road LK 299231, which leads towards the settlements of Groblje and Češča vas. On the right bank, the footbridge will connect to existing traffic areas (Irča vas street, which is connected to Topliška cesta). The Irča footbridge is an integral part of the Drska-Bršljin cycling route.

Flag of Slovenia  Jugovzhodna Slovenija, Slovenia