The scope of the project includes the reconstruction of the existing overhead single-track line WN 110 kV SE (system station 110 kV/110 kV Płock — GPZ Sierpc without changing the route of the line). The redevelopment is to adapt the line to the increased current load capacity to enable the development of renewable energy. The project also foresees the liquidation of conflicting parts of the SN and nN lines as intersectional facilities, without which the planned solutions of the WN 110 kV SE Płock-GPZ Sierpc line could not be carried out.