Kohesio: discover EU projects in your region

project info
Start date: 1 January 2019
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 336 943,06 €
EU contribution: 286 401,62 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego
intervention field
beneficiary
European Commission Topic

Construction of bicycle paths with accompanying infrastructure in the city of Chęciny

The subject of the investment is the construction of bicycle paths and pedestrian-bike tracks along with the accompanying infrastructure in the city of Chęciny about długości:2,13 km at: It’s an OS. Midnight, ul. Kazimierz the Great and Volodyjowski and ul. The Branicki. In addition, the reconstruction of the road was planned. The castle and the road by the designed park — a link between Armii Krajowa Street and the designed Piłsudskiego Avenue. The activities provided for in the project will allow for some of the objectives specified in the PGN to be met, and thus contribute to the implementation of the actions for the climate and energy package until 2020, i.e. the so-called “Climate and Energy Package”. 3x20. The project assumes the implementation of comprehensive actions that will improve air quality in the City of Chęciny and thus reduce harmful substances emitted into the atmosphere. The main objective of the project is to reduce emissions of greenhouse gases and other harmful substances from transport in the City of Chęciny by building a network of bicycle paths. The implementation of the project will contribute to better use of the environmentally friendly cycling system. Specific objectives: 1 Improvement of the environment by reducing CO2 emissions in Chęcin, 2 Improving safety in road traffic, 3 Strengthening the socio-economic development of the City, 4 Increasing the tourist potential of the City of Chęciny. Indicators: Length of roads built for bicycles[km]-2.13 km; Estimated annual decrease in greenhouse gas emissions [tonnes of CO2 equivalent] — 1.39. The objectives of the project and the planned activities are in line with the specific objectives set out for the 3 rd Priority Axis of the ROP 2014-2020 and the specific objectives of Measure 3.4. Total value: 2 280 422.26 PLN, eligible expenditure: PLN 1 432 734.04, requested co-financing: 1 361 097.34 PLN.

Flag of Poland  Kielecki, Poland