Start date: 1 October 2020
End date: 15 May 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 513 260,00 €
EU contribution: 2 986 271,20 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego

Flood protection msc. Ostrowiec Świętokrzyski ed. Ostrowiec Świętokrzyski and Bodzechów commune, based on the regulation of the Modła river using the existing reservoir in Częstocice as a flood polder to reduce the flood wave

As part of the projected work, it is planned to carry out: — construction of a system of dry flood reservoirs (plain polishers), with four piling partitions equipped with bottom drains — regulation of the Modła river in km 8+ 666-8 + 871 over a length of 205 m, including demulsion, deepening and insurance of slopes, — regulation of the Tributary from Mychów in km 0+ 000-0 + 084 over 84 m, detachment, deepening and insurance of slopes, — reconstruction of the culvert on the river Modła in km 7+ 918 and repair of the culvert in km about 8+ 837, — elevation of the left flood embankment in km 0 + 012-0 + 328 of the Modła river using a resistance wall 0.5 m from the intervalve. The implementation of the task will increase the effectiveness of counteracting the effects of natural disasters in the project area and contribute to flood protection of 2,000 people.

Flag of Poland  Kielecki, Poland