As part of the projected work, it is planned to carry out: — construction of a system of dry flood reservoirs (plain polishers), with four piling partitions equipped with bottom drains — regulation of the Modła river in km 8+ 666-8 + 871 over a length of 205 m, including demulsion, deepening and insurance of slopes, — regulation of the Tributary from Mychów in km 0+ 000-0 + 084 over 84 m, detachment, deepening and insurance of slopes, — reconstruction of the culvert on the river Modła in km 7+ 918 and repair of the culvert in km about 8+ 837, — elevation of the left flood embankment in km 0 + 012-0 + 328 of the Modła river using a resistance wall 0.5 m from the intervalve. The implementation of the task will increase the effectiveness of counteracting the effects of natural disasters in the project area and contribute to flood protection of 2,000 people.