Kohesio: discover EU projects in your region

project info
Start date: 1 February 2021
End date: 31 March 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 501 108,66 €
EU contribution: 333 999,19 € (66,65%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Świętokrzyskiego obsługiwany przez Urząd Marszałkowski Województwa Świętokrzyskiego
European Commission Topic

Thermomodernisation of public buildings in the Daleszyce Commune

The project includes investment activities in 2 building. pub. in the towns Szczecno and Brzechów (Daleszyce, pow.kielecki, voivodeship) Świętokrzyskie), consisting of complex., deep thermal modernisation with the use of RES. As part of the project, the facility will be warmed by warming external walls, ceiling, roof, replacement of windows and external doors, as well as modernisation of C.O. and CWU installations. Indoor lighting will be replaced and the oze installation will be installed — photovoltaic panels for the production of en. electr..The adaptation of the method and technologies of work execution depends on the result of the audit of the effect and energy of the building and will result from the Low-Emission Economy Plan for the reduction of CO2 emissions, greenhouse gases, i.e. the reduction of broadly understood low emissions. The project will be implemented in the formula “design and build”. The aim of the project is to increase the effect.energ.in the public sector in Gm. Daleszyce through the modernisation and thermomodernisation of the public use building and the reduction of subs. damage emissions to the air thanks to the use of RES and the replacement of lighting. The project is in line with the objectives of detail. 6 priority axes, i.e. Increase effective.energet. in the utilities sector in the area of KOF. indicators: —Use of thermally modernised buildings [m²]:2149,8 -L. of modernised heat sources [pcs.]:2 -L. select of electricity generation units from RES [pcs.]2 -estimated annual decrease in greenhouse gas emissions [tonnes of CO2 equivalent]:163,98 -Mm. annual primary energy consumption in public buildings [kWh/year]:615 146, 12 -Mm. final energy consumption as a result of projects [GJ/year]:2701,93 -Il. of thermal energy saved [GJ/year]:1828,23 -Il. of electricity saved [GJ/year]:15,48 Period realizacji:01.02.2021-31.03.2022 Total project value: 2 437 000,00 PLN, co-financing: PLN 1 502 470.48, own contribution: 934 529.52 PLN.

Flag of Poland  Kielecki, Poland