Start date: 31 March 2021
End date: 31 March 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 866 954,65 €
EU contribution: 1 863 520,52 € (65%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
European Commission Topic

Construction of an integrative kindergarten and nursery in passive technology in Stalowa Wola Municipality

The main objective of the project is to improve air quality and reduce greenhouse gas emissions through the construction of a passive building in Stalowa Wola Municipality. The following specific objectives are to be achieved: increasing access to modern and ecological solutions used in thermal and electrical production in pub utility buildings. installation of RES installations capable of covering a significant part of the energy demand, conducive to the reduction of emissions of harmful gases and dusts into the atmosphere; promoting attitudes related to energy saving and increasing responsibility for the state of the environment and air pollution. As a result of the project, a demonstration pub utility facility will be built in passive technology, in which an urban integration kindergarten with a nursery will function. The newly created facility will use ok. 14.7 kWh/m² year en. final year for heating and preparation of c.w.u. The primary energy consumption for heating and mechanical ventilation, c.w.u., cooling and lighting will be at the level required by WT pairs. 329 as of 01-01-2019 for pub utility buildings, i.e. 44.3 kWh/m²year. RES will cover 46.5 % of the demand for the final building. The building of the kindergarten and nursery was designed as a detached object with two above-ground floors and partly with one underground floor, on a plan close to a square. In the building it is planned to use mechanical ventilation with heat recovery, installation of a heat pump and photovoltaic installation. Shading devices, summer cooling system and automatic indoor temperature control will be installed. There will also be a charging point for electric vehicles next to the building.In addition, within:1 year after the completion of the project, a thermal imaging bad. continuity of insulation layers and bad air tightness will be carried out; 6 months after a full year of use — as-built audit ef.energet

Flag of Poland  Tarnobrzeski, Poland