The main objective of the project is to protect the natural environment and increase the use of energy from renewable sources in Gm. Serniki through installation of instal.photovoltaic, solar collectors and biomass boiler in residential buildings. As part of the project, Oze installations with a total capacity of 0.61728 MW (169 units of Wytw.elekt and 36-en.cieplna) are installed. Types of installation: PV (169pcs): 2,04 kW:b.mieszk.-26,b.gosp.-8, ground-2;2,72 kW:b.m.-41,b.g.-11, ground-2; 3.4 kW: b.m.-56, b.g.-19, ground-4; solar collectors (35pcs):2-panel (power: 2.72 kW) b.m.-27, b.g.-2;3-panel (power: 4.08 kW)b.m.-5, b.g.-1; biomass boilers1pcs-25 kW. The additional generation capacity of en.electrical oze is -0,48892 [MWe] and en.insulated 0.12836 [MWt]. RES installations will reduce CO2 emissions to the atmosphere by more than 30 % and other greenhouse gases by more than 10 %. The project foresees the use of modern technologies infor.-kom., in the form of an energy management system (ICT system), an online form and the creation of a subpage Internet.promoting oze — this portal will implement and promote clean energy solutions, services and products and promote the municipality as a clean energy center in the peripheral area. Project is a solution to reduce the risk of power shortages in the energy system by diversifying energy generation in the building and distributing en.elect from renewable sources to the existing energy grid. The target of the project is the inhabitants of Gm.Serniki as a direct use of.infra. resulting from the implementation of the project. The production of en.elektr. from newly built installations is 488.92 MWhe/year, en. warmna — 175.3508 MWt/year, estimated annual decrease in greenhouse gas emissions — 453,780 trCO2/year. The project is in line with the air quality programmes for the Lublin zone and ensures compliance with Directive 2008/50/EC of the European Parliament and of the Council of 21 May 2008 on ambient air quality and clean air for Europe.