Start date: 26 September 2019
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 637 409,85 €
EU contribution: 541 798,37 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Dolnośląskiego obsługiwany przez Urząd Marszałkowski

Construction of rainwater sewerage, renovation of ditches together with water structures and equipment and construction of rainwater pumping station in Żmigród

The material scope of the project includes the construction of 0.84 km of rainwater in the area of ul. Jasmine and ul. Lavender in Żmigorod (collector draining along ul. Jasmine from the entrance of the drainage ditch ul. Wrocławska to the entrance to the Sąsieczna Canal, rainwater for ul. Lavender located north of ul. Jasmine) and renovation of ditches with water equipment and structures, receiving rainwater and melting water from the catchment area of the district of ul. Craftsmanship, ul. T. Kościuszki and the Żmigrod ring road together with the construction of a rainwater pumping station with a suction pipeline of rainwater drainage from the pool well to the pumping station and the rainwater compression pipeline from the pumping station to the intervalve of the river Ssiecznica. Investment concerning rainwater sewerage in the area of ul. Jasmine and ul. Lavender is part of a greater infrastructural intention regarding the construction of municipal roads. The project provides for the use of natural or natural methods such as drainage ditches. The direct effect of the project will be the creation in the area of ul. Lavender and ul. Jasmine and ul. Craftsmanship, ul. T. Kościuszki and the Żmigrod ring road, an efficient system of draining rain and melt waters, which will protect the inhabitants from adverse weather phenomena and their consequences — drownings. It will also contribute to improving the safety of road users by draining rainwater from the sidewalks and roadways through the built rainwater system. The investor, beneficiary and entity implementing the project is the Municipality of Żmigród, which will also be the operator of the co-financed infrastructure. The main recipients of the project are residents of the above-mentioned commune, including, above all, ul. Jasmine, ul. Lavender (north of ul. Jasmine) and ul. Craftsmen, people using the above-mentioned roads, as well as the Municipality of Żmigród. The project foresees the application of a flat rate for selected indirect costs.

Flag of Poland  Wrocławski, Poland