project info
Start date: 8 October 2020
End date: 18 January 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 69 608,82 €
EU contribution: 59 167,49 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Warmińsko-Mazurskiego
intervention field

Installation of RES in the enterprise “ORIENTAL”

The investment covered by this project consists of the installation of a wind turbine with a vertical axis of rotation with a power of 10 kW together with an energy storage at Prosta street in Pasymiu on dz.nr 419/6 and 420/6 Area of Belt 3. As part of this project, a turbine is being designed, which will work in the on-grid system. Starting speed 1.2 m/s, average annual productivity at 5.8 m/s about 13.206 MWh/year. Noise level measured at a distance of 60 m at a wind speed of 8 m/s not more than 46 dB. The installation will be embedded on a concrete/metal pole/cracker with a height of about 13 m. The project fits into the type of project mentioned in the SzOOP ROP WiM 2014-2020 for the operation of 4.1- wind power plants — up to 200 kWe. The installation in accordance with the option described in the SzOOP will serve the needs of the company’s own needs and will be connected to the network, however, due to the capacity of the installation (up to 50 kW) in accordance with the Act of 20 February 2015 on renewable energy sources (Journal of Laws of 2015 No. U. 2015 item. 478) and Article 2(2) of the Act of 7 June 2018 amending the Act on Renewable Energy Sources and certain other acts (Journal of Laws 2018 item. 1276.) it will be made on the basis of a notification without the need for the beneficiary to have valid technical conditions for the connection of all energy generation sources included in the project to the electricity grid. This device produces electricity by using a wind turbine. Wind energy is a transformed form of solar energy and is created by the difference in air mass temperatures caused by the uneven heating of the Earth’s surface. The turbine will be connected to the grid and will have an energy storage that will allow the wind farm to retain its energy for the time it does not function. The project meets all the boundary conditions specified in the SzOOP ROP WiM 2014-2020.

Flag of Poland  Olsztyński, Poland