Kohesio: discover EU projects in your region

project info
Start date: 4 November 2020
End date: 29 April 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 68 678,05 €
EU contribution: 58 376,34 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Warmińsko-Mazurskiego
intervention field

“Investment in RES by Maconet Gołaszewski Wojciech”

The investment covered by this project consists of the installation of one wind turbine with a vertical axis of rotation with a power of 10 kW and an energy storage at Jana Pawła II 3b street in Pasymio dz. 304 Belt area 2.In this project, 1 turbine is designed, which will work in on-grid systems (in cooperation with the power grid) and an energy storage consisting of 1 hybrid inverter.The starting speed of 1.2 m/s, average annual productivity at the wind of 5.7 m/s about 10.747 MWh/year.The noise level measured at a distance of 60 m/s at a speed of 8 m/s of no more than 46 dB.The installation will be embedded on the pole. the project fits into the type of project mentioned in the SzOOP ROP WiM 2014-2020 for the operation of 4.1- wind power plants — up to 200 kWe.The installation according to the possibility described in the SzOOP will serve the needs of the company’s own needs and will be connected to the network, however, due to the capacity of the installation (up to 50 kW) in accordance with the Act of 20 February 2015 on renewable energy sources (Journal of Laws 2015, item. 478)and Article 2(2) of the Act of 7 June 2018 amending the Act on renewable energy sources and certain other acts (Journal of Laws 2018, item. 1276.) it will be made on the basis of a notification without the beneficiary having to have valid technical conditions for the connection of all energy sources included in the project to the electricity grid.This device produces electricity by using wind turbines.Wind energy is a converted form of solar energy and is created by the difference in temperature of air masses caused by uneven warming of the Earth’s surface.Turbines will be connected to the grid, but there will be no need to install batteries and charging regulators, because the network is able to accept all the produced energy.The project meets all the shore conditions laid down in the SzOOP RPO WiM 2014-2020.

Flag of Poland  Olsztyński, Poland