The project will be implemented in the Kujawsko-Pomorskie Voivodeship, in the Inowrocław Municipality. The subject of the project is the renewal of the common parts of multi-family buildings in Inowrocław located at the following addresses: Dworcowa 92-94, Kasztelańska 12, Kilińskiego 6, Poznańska 336, Poznańska 359, Poznańska 365, Poznańska 367 and 367A. The scope of the project includes the following construction works in individual buildings:1. Dworcowa 92-94:• renovation of the walls of the buildings from the backyard of the main building and outbuilding,• replacement of window joinery,• renovation of roofing material.2. Kasztelańska 12:• renovation of the facade with thermal insulation of the main building and the building of the outbuilding,• replacement of window, door and steel doors for wooden windows.3. Kilińskiego 6:• renovation of external walls along with their insulation,• replacement of window and door joinery.4. Poznańska 336:• renovation of the facade with partial thermal insulation,• replacement of window and door joinery.5. Poznańska 367:• renovation works and thermal insulation of external walls,• replacement of window and door joinery,• execution of a new band.6. Poznańska 367A:• renovation and thermal insulation of external walls,• replacement of window joinery and external doors,• performance of wristbands.7. Construction of the network and connections of sanitary sewerage drainage — Poznańska 359,365,367,367A: Sanitary sewage will be discharged to the ks300 sewage system located in ul. Mątewska via the designed connections and network. — arrangement of sewer pipes insulated with polystyrene,- sections of pipes from buildings to the first wells designed from pvc pipes, other gravitational sections of stoneware tubes on both sides glazed,- pvc inspection wells with heavy manhole and wells of reinforced concrete coils with heavy manhole with latch. The tank of the pumping station made of polymer concrete, monolithic.For a detailed description of the project can be found in Stud.Wyk. on pp. 32-36. The scope of work presented in annexes No. 5 in each project.