project info
Start date: 23 November 2016
End date: 31 December 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 643 661,78 €
EU contribution: 482 746,33 € (75%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Warmińsko-Mazurskiego
European Commission Topic

“Reconstruction of district road No 1370N from Siła in km 12+ 300 to DK51 in km 15+ 630 -stage II”

The subject of the project is the implementation of the investment in the area of G. Stawigud. Planned investment consisting of the reconstruction of the district road No 1370 N together with the necessary infrastructure in the town of Tomaszkowo, Stawiguda on a section of 1.523 km (stage II). Location — mileage Stage II-1 + 600-3 + 123.21. Load capacity of the road up to 115kN for the KR2 road. The scope of works for the entire construction purpose and the order of implementation of individual elements include: demolition robots (surface) -earth robots-execution of excavations in unscathed land, making embankments -construction of substructures-roads, pavements, descents, drainage islands -making the road surface, pavement, exits, draining islands -making curbs and pavement edges, -execution of horizontal, vertical markings -execution of the side-side from the destruction of the surface obtained from the milling of the pavement, -Accompanying works: Implementation of cross-section sewage, securing underground infrastructure, building culverts, Additionally, as part of the project, the construction of central ails in the roadway axis — (two central asylums at the inlet and outlet from the village) and the construction of an elevated pedestrian crossing. A detailed description of the techn. is included in the attached design document. Stages of project implementation: submission of an application for dof. signing an agreement on dof. —selection of the contractor in accordance with the PZP -conclusion of the contract with the contractor and commencement of works -implementation of works according to the planned schedule -promotion of the project -complete the project and signing the final protocol — final settlement of the project. The project is in line with the assumptions set out in the SzOOP ROP WWM 2014-2020 in pursuit of the objective of: Improving the external accessibility and internal transport cohesion of the Olsztyn Municipal Functional Area. The subject of the project is the reconstruction of a local road in the functional urban area of Olsztyn (Mobilny MOF) — district road No 1370N.

Flag of Poland  Olsztyński, Poland