The project aims to build the S11 expressway along the Olesna bypass with a total length. 24.78 km (including: 24.45 km with S-class parameters and 0.33 km with GP class parameters), located in the TEN-T comprehensive network. Its beginning was designed on the existing dk 11 near the Ciarka Cologne, which a new trace omits from the south side. The end of the investment was located on the border of Opolskie and Silesian Voivodeships. The route of the designed bypass crosses the existing dk 11, dw 494, railway line 143, as well as rivers: Stobrawa and Lomnica.