The subject of the project is the construction of the Leśniwice-Rronów gas pipeline as the second and third stage of the Gustorzyn-Rronów gas pipeline. The scope of work includes the construction of a new DN 1000 gas pipeline with a maximum operating pressure of MOP 8.4 MPa with a length of 253.5 km along with the infrastructure necessary to operate it, among others: dam and vent assemblies, including connection, transmission-receiving piston lock, exits and access roads, cathode protection stations, cable sewerage with fiber optic and switching unit to the existing Wronów junction.