The subject of the project is the construction of the Gustorzyn-Leśniwice gas pipeline as the first stage of the Gustorzyn-Wronów pipeline. The scope of work includes the construction of a new gas pipeline DN1000 with a maximum operating pressure of MOP 8.4MPa with a length of approx. 54 km along with the infrastructure necessary for its operation, among others: dam and vent assembly, cathode protection station, fiber optic, access road and connection unit to the Gustorzyn junction. The Gustorzyn-Leśniwice pipeline is the first stage of the construction of the Gustorzyn-Rronów gas pipeline. The whole gas pipeline will be one functional whole. Implementation of the task of Gustorzyn — Crows (length approx. 307.5 km) assumes a division into three stages of implementation, i.e. Gustorzyn — Leśniwice, Leśniwice — Rawa Mazowiecka, Rawa Mazowiecka — Wronów