As part of the project, the system of forced equilibrium ventilation will be installed with the provision of forced supply and air drainage and with the recovery of heat from the waste air in the community centre in Úštěk (p. The stunt,). The project will be implemented in parallel with a comprehensive solution of the energy performance of the building. The applicant plans to partially finance the project from the so-called boiler loans.