The aim of the project is to reconstruct existing roads II/605 (Plzeňská) and III/2365 (Jungmannova) in the built-up area of Beroun and Králův Dvůr. The need for the reconstruction of these roads is due to the need to significantly improve the technical parameters of the roads, which no longer meet the current traffic requirements. On the basis of the recommendations given in the DP, the road cover will be reinforced by 10 mm, with a complete reconstruction (both rough and loading layers) of the communication in some sections.