Solves thermal circuit. construction, insulated roofs, replacement of filling holes of Hall H on parcel 2237, pč. 813. The building is affected by the comments of the conservationists, the monument document see attachments, according to PrŽaP it is necessary to meet 10 % energy savings, the achieved energy savings of 32.62 % are requested to grant 50 % + EPC 5 %. The applicant assumes the use of the EPC method in the building, cost-saving examinations solved in the previous call 70 (for the project under registration number CZ.05.5.18/0.0/0.0/17_070/0006789). We are asking for support from NZU.