Kohesio: discover EU projects in your region

project info
Start date: 17 December 2021
End date: n/a
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 4 428 000,00 €
EU contribution: 1 328 400,00 € (30%)
programme
Programming period: 2014-2021
Managing authority: Ministerstvo průmyslu a obchodu / Útvar náměstka ministra pro fondy EU

Energy-saving measures in the substrate production process

The company TŘINECKÉ ŽELEZÁRNY, a.s. is a metallurgy with a closed production cycle, which includes operations from primary production to the final hot-rolled steel product. The essence of the project is the replacement of the existing two milling lines for the machining centre, with the aim of reducing energy intensity and increasing the efficiency of the production process of ribbed bases on the operation of VH — Roller billets and rough profiles, the VHD centre — Drobná dráhyivo in TŽ, a.s.

Flag of Czechia  Moravian-Silesian Region, Czechia