The project consists of a new construction of a central biomass boiler room with an output of 2 500 kW and a gas boiler room with an output of 2 500 kW including technology, biomass storage, new backbone heat distribution including the building of a distributor, transfer stations and object boiler rooms. The construction is proposed on land owned by the state, jurisdiction to manage land has the Ministry of the Czech Republic (see Annex ŽoD). Our own boiler room, biomass storage, retention tanks, distribution facility and paved area are located specifically on the plot of parc. 7129/1.